Solar/IPS Calculator Guide Bangladesh: Understand Load, Backup Time and Solar Size

A simple planning guide covering watts, watt-hours, inverter headroom, battery energy and rooftop solar.

Start with a load list

Illustrative backup load
LoadQtyWatts eachTotal
BLDC fan236W72W
LED light412W48W
Laptop165W65W
Total running load——185W
Basic energy needLoad energy (Wh) = Running watts × Backup hours

A 185W load for three hours requires 555Wh ideally. Conversion losses, usable capacity, ageing and reserve can require a larger nominal battery.

Running load

Add normal wattage of devices that run together.

Starting/surge load

Motors and compressors can need more startup power; check manufacturer specifications.

Usable battery energy

Not all nominal Wh may be usable depending on chemistry, BMS and depth-of-discharge limits.

Real-world losses

Conversion, wiring, temperature and battery age can reduce backup time.

Basic logic for estimating solar

Simplified daily-energy viewDaily solar energy ≈ Panel kW × Effective sun hours × System efficiency

Roof orientation, shading, weather, inverter clipping, cable loss and location affect actual generation.

Under SREDA Net Metering Guidelines 2025, eligible grid-connected consumers can use renewable electricity generated on their premises and receive credit for surplus exports. Net-metering eligibility should therefore be a separate step in an on-grid rooftop-solar estimate.

Sources & references

  1. SREDA — Net Metering Guidelines 2025Official guideline covering net metering and system requirements.
  2. SREDA National Solar Help DeskSolar and net-metering resources and notices.